Enera de Mexico SF1
Project Size: 135 MW
Location: North of Chetumal, Mexico
Mounting Solution: 1-Axis ground mount
Status: Awaiting MX policy reform
Project Summary:
Enera Power launched the San Felipe Solar Project in 2019—a ground-mounted photovoltaic facility located on land fully entitled by Enera. The site covers approximately 828 acres, with a planned capacity of up to 135 MW of solar generation.
Key Milestones:
Enera Power, began development rights and secured land use and regulatory approval for 828 acres at San Felipe, setting the stage for full-scale development .
TNX Holdings exited their involvement in Enera in 2023. Mexico Policy reform is required to advance the project.
Technical Scope:
* Total Area: ~838 acres
* Planned Capacity: 135 MW(DC) of solar PV
The San Felipe site is an approximate 335 Hectare site (828 acre) that has road access to a major highway system between Cancun and Chetumal. The site is crossed by both transmission and distribution voltage CFE lines.

Location: North of Chetumal, Mexico
Mounting Solution: 1-Axis ground mount
Status: Awaiting MX policy reform
Animation of 135MW master planProject Summary:
Enera Power launched the San Felipe Solar Project in 2019—a ground-mounted photovoltaic facility located on land fully entitled by Enera. The site covers approximately 828 acres, with a planned capacity of up to 135 MW of solar generation.
Key Milestones:
Enera Power, began development rights and secured land use and regulatory approval for 828 acres at San Felipe, setting the stage for full-scale development .
TNX Holdings exited their involvement in Enera in 2023. Mexico Policy reform is required to advance the project.
Technical Scope:
* Total Area: ~838 acres
* Planned Capacity: 135 MW(DC) of solar PV
The San Felipe site is an approximate 335 Hectare site (828 acre) that has road access to a major highway system between Cancun and Chetumal. The site is crossed by both transmission and distribution voltage CFE lines.